5 FABRICATION All the“hard”work happens during the engineering phase. Once drawings are finalized, Panel Pros is ready to order materials and begin the fabrication process. •  In our 40,000-square-foot panel shop, our crew creates structural steel studs guided by instructions based on the approved drawings. •  By producing our own studs, we are able to control costs and pass the savings on to the developer. Indoor fabrication also results in less material waste, which also translates into reduced costs. We can also work quickly without our schedule being impacted by weather conditions. •  Panels are ready by the time the job site is ready for them. We load our trucks and deliver panels on demand. PHASE 2  FINAL PHASE: INSTALLATION